Aswan Modular Refinery |
Project Name |
|
North of Aswan Governorate |
Project Location |
- Refining crude oil produced in south regions or imported crude oil
- Covering Aswan and Qena governorates needs of main petroleum products
|
Project Objective |
|
Providing transportation of crude oil from South to North and of petroleum products from North to South |
Project Description |
|
A small refinery unit ( multiples of 10.000 b/d) its capacity will be specified on the basis of a feasibility study
|
Production Capacity |
|
2 years |
Duration of implementation |
|
To be specified on the basis of a preliminary feasibility study
|
Estimated Cost |
|
To be specified on the basis of a preliminary feasibility study
|
Rate of Return of Capital |
|
Ganoub El wadi Holding Company |
Responsible Entity for the Project |
|
Main investor |
Shareholders |
|
To be specified on the basis of a preliminary feasibility study
|
Financing |
|
2011/2012 |
Start up date |
|
A Preliminary feasibility study is currently being carried out |
Current Status |